Thursday, January 6, 2011

Monday, January 3, 2011

1207 Minnie-'11






Here's hoping your new year is getting off on the right foot.
I apologize for the lack of updates recently as I've been working towards my competitive eating goals since Thanksgiving.

Our lighting fixtures are all in and our final electric inspection passed today so we should have some evening exterior/interior shots coming soon (maybe tomorrow).
Trim out for our mechanical will follow as soon as we complete our tile and flooring.

I assure we will have some new pictures up as soon as humanly (City of Austin) possible.

Wednesday, November 3, 2010

Septic/final grade/seed


Drip tubing for the aerobic
The field
Dropping the tank into place.


County inspection.
The final grade is done and the seed is down.

We should have a little grass up within a few weeks.

Friday, October 29, 2010

Septic/cabinets/drive

Our driveway is finally complete and the light boxes have been installed.

The septic install began yesterday.
Master Sinks along with Scott's custom cabs.
Master cabs again.
Barn Door (slider) for the pantry.
Pantry layout.

Monday, October 18, 2010

I assure you we are still here.

We are currently working towards completing the built-ins and beginning our septic system. I will be posting pictures later this week.

Friday, September 10, 2010

Update

The exterior is done.



Textured and primed.

Thursday, August 19, 2010

Sheetrock/Driveway


The steel for the first portion of the drive will start tomorrow.
The underpinning was completed today. You'll also notice that we've brought up the grade a bit.
A rear sidewalk to the back entrance.
Forms for the drive.
The grade and underpinning again.
Scott's lighting columns are a throw back to our uncle's house in our home town. These will be finished with white plexi on the interior and low voltage lighting to accent the drive.
We plan on wiring in the carports as well as some low voltage behind the slates of the boat storage.
The tall column will be at the entrance of the drive (along with another opposite) and the short ones will be staggered up the drive.
The sheetrock is up with an inspection tomorrow before tape/float/texture.

More pics of the progress to come.